Airside Controls · VAV Terminal Units
Fan-powered parallel VAV
VAV terminal unit — Above ceiling
ConnectionPrimary inlet, discharge, induction air
SupportIndependent heavy support
How to install it
- 1
Support unit
- 2
connect ducts
- 3
keep induction opening clear
- 4
wire fan and controls
- 5
test sequence.
Quality check
- Fan cycles correctly, no recirculation obstruction
Stop and verify
Stop if induction path is blocked