Airside Controls · VAV Terminal Units

Fan-powered parallel VAV

VAV terminal unit — Above ceiling

ConnectionPrimary inlet, discharge, induction air
SupportIndependent heavy support

How to install it

  1. 1

    Support unit

  2. 2

    connect ducts

  3. 3

    keep induction opening clear

  4. 4

    wire fan and controls

  5. 5

    test sequence.

Quality check

  • Fan cycles correctly, no recirculation obstruction

Stop and verify

Stop if induction path is blocked