Rectangular & TDC · Transitions & Reducers

Rectangular eccentric transition flat on top

Rectangular — Maintain top elevation

ConnectionFlanged or S-drive
SupportAdjacent supports

How to install it

  1. 1

    Mark top

  2. 2

    set large duct elevation

  3. 3

    connect large end

  4. 4

    keep top plane level

  5. 5

    align smaller duct

  6. 6

    connect and support.

Quality check

  • Top plane continuous
  • bottom changes smoothly
  • no twist

Stop and verify

Stop if flat side orientation conflicts with drainage/headroom