Air Distribution · Taps & Takeoffs

Tap into double-wall duct

Tap / takeoff assembly — Double-wall main

ConnectionDual-wall collar system
SupportIndependent branch support

How to install it

  1. 1

    Cut outer shell

  2. 2

    remove insulation locally

  3. 3

    cut inner liner accurately

  4. 4

    install inner collar and seal

  5. 5

    restore insulation

  6. 6

    close outer collar

  7. 7

    connect branch.

Quality check

  • Inner air barrier sealed, insulation restored, outer shell neat

Stop and verify

Stop if inner joint cannot be inspected before closure