Lift Operations · Two-lift operation

Raise long duct section

Commercial HVAC Operations — Two scissor lifts

Task typeTwo-lift operation
Tools / equipmentTwo trained operators, radios

How to install it

  1. 1

    Use approved coordinated lift plan

  2. 2

    assign one signal person

  3. 3

    match lift movement slowly

  4. 4

    keep load balanced

  5. 5

    never exceed either platform rating.

Quality check

  • Both lifts level
  • synchronized movement
  • no side loading

Stop and verify

Stop without supervisor-approved plan