Lift Operations · Power-line hazard

Maintain electrical clearance

Commercial HVAC Operations — Aerial/scissor lift

Task typePower-line hazard
Tools / equipmentSite electrical plan

How to install it

  1. 1

    Identify energized lines

  2. 2

    maintain required clearance

  3. 3

    use employer electrical safety plan

  4. 4

    do not use lift as grounding or contact point.

Quality check

  • Safe clearance maintained

Stop and verify

Stop and contact supervisor if voltage/clearance is unknown