Lift Operations · Installing hangers

Drill and hang supports

Commercial HVAC Operations — Scissor lift

Task typeInstalling hangers
Tools / equipmentDrill, PPE, tethering as required

How to install it

  1. 1

    Barricade below

  2. 2

    position platform square to work

  3. 3

    remain on floor

  4. 4

    use proper drill control and dust protection

  5. 5

    install support without leaning over rails.

Quality check

  • Gate closed
  • no climbing
  • debris controlled

Stop and verify

Stop if reach requires standing on rail or ladder