Corrosion-Resistant Systems · Install guide
QA, Inspection & Closeout
Pre-cover inspections, galvanic-contact checks, stainless hardware QA, anti-seize inspection, pool and wastewater closeout, and turnover records.
Corrosion-Resistant SystemsQA, Inspection & Closeout
Perform stainless duct pre-cover inspection
Stainless duct · Concealed corrosive system
Open installation →Corrosion-Resistant SystemsQA, Inspection & Closeout
Inspect aluminum duct for galvanic contact
Aluminum duct · Pool, exterior, process
Open installation →Corrosion-Resistant SystemsQA, Inspection & Closeout
Inspect 3/8-inch stainless bolted joints
Stainless hardware · Flanged duct/supports
Open installation →Corrosion-Resistant SystemsQA, Inspection & Closeout
Inspect anti-seize application quality
Anti-seize · All stainless threaded joints
Open installation →Corrosion-Resistant SystemsQA, Inspection & Closeout
Perform pool-area corrosion walk
Stainless/aluminum duct systems · Natatorium
Open installation →Corrosion-Resistant SystemsQA, Inspection & Closeout
Perform wastewater washdown inspection
Corrosion-resistant systems · Wastewater facility
Open installation →Corrosion-Resistant SystemsQA, Inspection & Closeout
Create stainless hardware replacement schedule
Bolts, nuts, washers · Long-term maintenance
Open installation →Corrosion-Resistant SystemsQA, Inspection & Closeout
Create corrosion photo record
Installed duct system · Pool, wastewater, industrial
Open installation →Corrosion-Resistant SystemsQA, Inspection & Closeout
Prepare corrosive-system maintenance guide
Stainless/aluminum/coated/FRP systems · Owner turnover
Open installation →Corrosion-Resistant SystemsQA, Inspection & Closeout
Final material and substitution audit
All corrosion-resistant duct · Project closeout
Open installation →