Air Distribution · Plenums

Ceiling return plenum chamber

Plenum box assembly — Above ceiling zone

ConnectionMultiple grille openings
SupportBuilding/duct enclosure

How to install it

  1. 1

    Define plenum boundaries

  2. 2

    seal penetrations

  3. 3

    install return grilles

  4. 4

    maintain code-compliant materials and pathways.

Quality check

  • No uncontrolled leakage, access maintained, prohibited materials absent

Stop and verify

Stop if ceiling plenum code requirements are unclear