Ventilation Equipment · Make-Up Air

MUA with packaged DX cooling

Make-up air unit — Roof/grade

ConnectionSupply duct + refrigeration package
SupportUnit base/curb

How to install it

  1. 1

    Set and secure unit

  2. 2

    connect duct and utilities

  3. 3

    verify condensate drainage

  4. 4

    power compressor section

  5. 5

    inspect piping

  6. 6

    commission cooling and airflow.

Quality check

  • Condensate drains, airflow proven, service clearances met

Stop and verify

Stop if electrical/refrigerant startup requirements are unmet