Ventilation Equipment · Make-Up Air

MUA with hot-water coil

Make-up air unit — Indoor/outdoor

ConnectionSupply duct + hydronic piping
SupportUnit base/frame

How to install it

  1. 1

    Install unit

  2. 2

    connect duct

  3. 3

    pipe coil with valves, vent and drain

  4. 4

    insulate

  5. 5

    pressure-test

  6. 6

    wire controls

  7. 7

    commission.

Quality check

  • Coil protected from freezing, valves accessible, no leaks

Stop and verify

Stop if freeze protection/control sequence is unclear