Ventilation Equipment · Make-Up Air

Ground-mounted vertical MUA

Make-up air unit — Concrete pad

ConnectionTop/side discharge
SupportPad and factory base

How to install it

  1. 1

    Prepare pad

  2. 2

    set unit plumb

  3. 3

    connect duct, gas, power and controls

  4. 4

    protect intake

  5. 5

    provide service clearance

  6. 6

    commission.

Quality check

  • Pad level, anchorage complete, intake clear

Stop and verify

Stop if drainage/flood elevation is inadequate