Corrosion-Resistant Systems · Corrosive Exhaust & Chemical Areas

Install acid-fume duct transition

FRP, coated metal, or alloy duct — Process exhaust

Hardware guidanceUse compatible flange hardware and washers.
Anti-seize / gallingKeep anti-seize away from laminate bonding surfaces.

How to install it

  1. 1

    Support transition

  2. 2

    orient for drainage

  3. 3

    connect using approved laminated/flanged/welded method

  4. 4

    avoid abrupt low pockets.

Quality check

  • No voids, unprotected cut edges, or liquid traps.

Stop and verify

Stop if field modification is not permitted.