Air Distribution · Concentric Boxes

Concentric box for rooftop unit drop

Concentric supply/return assembly — Ceiling below RTU

ConnectionSupply and return drops
SupportStructural support

How to install it

  1. 1

    Coordinate roof openings

  2. 2

    support box

  3. 3

    connect separate supply/return drops

  4. 4

    seal

  5. 5

    install room-side assembly.

Quality check

  • No crossed ducts, weather and air seals complete

Stop and verify

Stop if curb/opening layout does not match