Commercial Split Systems · Refrigerant line coordination
Route line set
Equipment Installation — Split system
Task typeRefrigerant line coordination
Tools / equipmentLine supports, insulation, approved tools
How to install it
- 1
Follow approved design and manufacturer limits
- 2
support and protect lines
- 3
maintain bend radius
- 4
insulate suction line
- 5
coordinate brazing/pressure test by qualified personnel.
Quality check
- Lines supported
- insulation continuous
- no kinks
Stop and verify
Stop if sizing, length, elevation, or refrigerant procedure is unknown