Commercial Split Systems · Split-system installation handoff
Prepare for licensed startup
Equipment Installation — Complete system
Task typeSplit-system installation handoff
Tools / equipmentChecklist, camera
How to install it
- 1
Verify indoor/outdoor units, drains, duct connections, line supports, controls pathway, electrical disconnect location, filters, and access
- 2
document for qualified startup.
Quality check
- Installation complete and accessible
- no debris
Stop and verify
Stop before charging/energizing unless authorized and qualified