Layout & Coordination · Hanger points
Mark support locations
Square Duct Installation — Straight run
Task typeHanger points
Tools / equipmentTape, marker, plans
How to install it
- 1
Starting from approved reference, mark supports around fittings, joints, and intervals per design
- 2
avoid access doors and dampers.
Quality check
- Supports do not block joints/access
- structural points valid
Stop and verify
Stop if hanger spacing/detail is unknown