Layout & Coordination · Hanger points

Mark support locations

Square Duct Installation — Straight run

Task typeHanger points
Tools / equipmentTape, marker, plans

How to install it

  1. 1

    Starting from approved reference, mark supports around fittings, joints, and intervals per design

  2. 2

    avoid access doors and dampers.

Quality check

  • Supports do not block joints/access
  • structural points valid

Stop and verify

Stop if hanger spacing/detail is unknown