Layout & Coordination · Control line

Establish centerline

Square Duct Installation — Straight corridor run

Task typeControl line
Tools / equipmentLaser, chalk line, tape

How to install it

  1. 1

    Transfer grid or wall reference

  2. 2

    snap/laser a continuous line

  3. 3

    mark offsets and fitting stations.

Quality check

  • Line references actual building control
  • no cumulative measuring

Stop and verify

Stop if wall/ceiling layout is not final