Air-Handling Units · Structural steel frame
Set AHU on steel
Equipment Installation — Indoor suspended/raised AHU
Task typeStructural steel frame
Tools / equipmentRigging, steel frame, isolators
How to install it
- 1
Verify frame load and dimensions
- 2
install isolation if specified
- 3
rig sections
- 4
set and align
- 5
bolt sections
- 6
anchor to frame.
Quality check
- Frame level
- section joints sealed
- load supported
Stop and verify
Stop without structural approval