Air-Handling Units · Housekeeping pad
Set AHU on concrete pad
Equipment Installation — Indoor AHU
Task typeHousekeeping pad
Tools / equipmentRigging plan, crane/forklift, level
How to install it
- 1
Verify pad dimensions, elevation, housekeeping curb, and service clearances
- 2
inspect shipping splits
- 3
rig from approved points
- 4
set level
- 5
anchor as specified.
Quality check
- Unit level
- doors open
- drain pan slopes correctly
- anchors complete
Stop and verify
Stop if pad, weight, rigging points, or clearances do not match submittal