Air-Handling Units · Vibration isolation

Install isolators

Equipment Installation — AHU base

Task typeVibration isolation
Tools / equipmentSpring/neoprene isolators, rigging

How to install it

  1. 1

    Place isolators at designed points

  2. 2

    set preload/deflection

  3. 3

    lower unit

  4. 4

    level

  5. 5

    install seismic restraints where required.

Quality check

  • Equal loading
  • no rigid bypass
  • restraints clear

Stop and verify

Stop if isolator selection does not match unit weight