Air-Handling Units · Vibration isolation
Install isolators
Equipment Installation — AHU base
Task typeVibration isolation
Tools / equipmentSpring/neoprene isolators, rigging
How to install it
- 1
Place isolators at designed points
- 2
set preload/deflection
- 3
lower unit
- 4
level
- 5
install seismic restraints where required.
Quality check
- Equal loading
- no rigid bypass
- restraints clear
Stop and verify
Stop if isolator selection does not match unit weight