Field checklist
Before leaving a connection
- Correct size and orientation.
- Level, alignment, and insertion are right.
- Required fasteners are installed.
- Seal is complete.
- Connection is independently supported.
- No sharp edges, debris, or loose parts remain.
Use the rule
Do not cover a problem just because the next trade is ready.